CASE STUDIES

SUBSEA PUMPING

Hydrocarbon recovery from subsea pipeline
Uniquely engineered solution consisting of pumping, measurement, filtration and storage. Pumping systems sourced from Australian mining industry, recertified and reframed by Intervention, fluid transfer equipment including hoses/reels, flowline, flow, density and pressure measurement engineered by Intervention.

DOWNLOAD CASE STUDY

ECHOMETER – CASE STUDY 1

Urgent request to determine suspected fluid losses within Well annuli
Rapidly mobilise Intervention echometer level detection equipment. Perform echometer acoustic shots and relay results to beach engineering team for immediate analysis. Analyse all shots with immediate effect and provide the customer with liquid level data results with which to make an informed decision.

DOWNLOAD CASE STUDY

ECHOMETER – CASE STUDY 2

Wellhead B Annulus liquid level detection with Echometer
Mobilise Intervention echometer level detection equipment and personnel. Perform echometer acoustic shots and relay results to beach engineering team for analysis. Analyse all shots and provide the customer with liquid level data results with which to make an informed decision.

DOWNLOAD CASE STUDY

GAS CAP MEASUREMENT – MIDDLE EAST

Investigate size of annulus leak rates on four suspect wells
Design and mobilise flow measurement and data recording skid based on Coriolis gas metering technology. Provide detailed report on all findings.

DOWNLOAD CASE STUDY

GAS CAP MEASUREMENT

Determine space occupied by gas cap in the A annulus
Mobilised Coriolis gas measurement and data recording equipment skid to suit customer requirements. Analysed data results to determine and verify actual gas volume as requested.

DOWNLOAD CASE STUDY

LEAK DETECTION MODELLING

Static Modelling Analysis
Work closely with the client to ensure the latest and most accurate information available is used to populate the analysis model. Provide a detailed report based on analysis of data to give leak location and size for a specific well using the latest most accurate data. Assist the customer with solution services to locate and seal the leak.

DOWNLOAD CASE STUDY

LEAK SEALING – CASE STUDY 1

Well Head Upper MS-T seal leak
Mobilised Intervention specialist sealmaker equipment within 24 hours. Upper MS-T Seal established and tested to 1600 psi. Back flow leak test performed successfully.

DOWNLOAD CASE STUDY

TRADE SHOWS & EVENTS

Please visit here for information about our next exhibition

Intervention Rentals
Europe +44(0)1241 830739
Middle East +974 4416 4478
Africa +233(0) 312 290610